3 Oct 2010
Total: 2 hours
Today I went to interview and to get task, which develop the website within 48 hours. 
  1. <Usecase description> 2hours We created Usecase description, however it needs still to update, because we don't get all information yet. I have learned UML in Japan, but this UML diagram is completely different. So I am still confused. Hopefully, we can get clear idea for the UML diagrams!


2 Oct 2010
Total: 5hours
  1. <Group meeting> 5hours We had a meeting to talk about the structure of the presentation, sitemap, paper  prototype, design of the page and ER diagram. Recently we were talking a lot. It is very hard for me to explain my thought. Usually, I could not explain well, so sometimes we were very confused each other. Maybe I need to talk more, however I don't have enough energy:) 
To do list
  • Create Usecase description
  • Make template
  • Modify ER diagram
  • Update Journal
  • Update blog
I have a lot of stuff!

1 Oct 2010
Total: 5hours

In this morning, still I was doing Japanese website design. I could learn how to use fireworks, which is very handy.
  1. <Group meeting> 5hours We discuss about activity diagrams and presentation structure. When we reviewed activity diagrams, we realized word definition is very important. For instance, we discuss about time sheet, which records how long accountants take time to a particular client. However, some people thought that is time card, which keep to record how many hours accountants work. Therefore, we lost the point of talking. After meeting, I thought we progress well. Anyway, I was totally exhausted.
  2. <Activity diagram> 1hour After reviewing, I revised activity diagrams. Sometimes I forgot comment of the arrow, so I changed that. This time, there are not so many corrections.
  3. <Install Anti-virus software> 1hour Now our server has very important information, and we connect our PC with using LAN. Therefore, I installed anti-virus software in the server. After installation, server could not see from our PC because of firewall. So I will change the setting.

30 Sep 2010
 Total: 4hours

Now I have two jobs, one is flash development and another is Japanese web site design. In the latter job, I have to create design short time. So during this time, I'm busy, but it is good experience. 

  1. <Group meeting> 2hours We discussed about the client meeting. Main person will go overseas for 3 weeks, but we cannot meet him before going. Instead of him, we can meet his wife, so we hope we will have a good time with our client.
  2. <UML Activity diagram> 1hour I revised Activity diagram, because I have some mistake. And sometimes I have grammatical mistake:)
  3. <SQL server setting> 1hour  I have connection problem of SQL server for 2 weeks. Finally, I have soluition for the problem. The solution is following.
SQL Server setting solution
When you try to connect from Visual studio,
  • Server name : IP address (Server name sometimes cannot connect )
  • Authentication : Server authentication (In SQL server, default setting is only Windows authentication. Therefore, we have to change setting to allow both authentications. )

29 Sep 2010
Total: 8hours
  1. <UML Usecase> 4hours We created UML Usecase, and then reviewed those diagram. After that, our teacher checked our Usecase diagram. This time, he said to us this is OK, but it is not final version. Maybe this diagram will be growing up, because we have not gotten every requirements yet.
  2. <Group meeting> 2hours We reviewed Usecase diagram after that our teacher checked them. Mainly, there is OK, so we started writing one Activity diagram and then we checked our activity diagram. This time they seem well.
  3. <UML Activity diagram> 2hours  I draw Activity diagram for system administrator. This is not so difficult. Therefore, I didn't take long time. But maybe we haven't recognized all functions.

28 Sep 2010
Total: 9hours
  1.  <Prepare Presentation> 4hours We practiced about the presentation and also our teacher checked the presentation. His presentation skills are astonishingly well! I want to learn presentation skills from him. And humor is also important. I understand it, but it is difficult for me.  
  2. <Presentation> 2hours I joined the presentation, in this semester, we have only this class. Other time are totally free, however I come to school as much as possible. Our presentation took half one hour, lest of time are other team presentations. We practiced many times, but I need more practice, because sometimes I forgot what I have to talk. Next time, I will try to do my best:)
  3. <UML Usecase> 3hours We reviewed UML Usecase diagram. Actually, academic UML is different from I understood, so I was very confused. Finally, we got an idea of the UML. I hope it will be correct way.    

27 Sep 2010
Total: 9hours
  1. <Prepare Presentation> 4hours We prepared tomorrow's presentation many times. It is difficult to make a presentation, but I got an idea of the presentation. Because there is a technique. So, I want to get phrases as much as possible! 
  2. <Making Presentation> 2hours I Prepared for the presentation slide. This time I used not Power Point, that's why I took time to make presentation. Maybe it is the good experience.
  3. <UML Usecase> 0.5hour I updated Usecase diagram. We have finished almost all Usecase diagram.
  4. <SQL server setting> 0.5hours I have still connection problem and I don't know the reason. Therefore after tomorrow's presentation, I want to search the solution of that problem.
  5. <Meeting> 1hours We have a meeting with teacher and group member. Communication is the most important. I want to enjoy doing the project.